Sign In | Join Free | My portofva.com
China KeLing Purification Technology Company logo
KeLing Purification Technology Company
KeLing Purification Technology Company Limited ------------------------------------------------------------- Advanced. High-Qulity. Reasonable.
Verified Supplier

12 Years

Home > Air Shower Tunnel >

PLC Control Air Shower Tunnel With Conveyor Roller Line / Auto Slide Door

KeLing Purification Technology Company
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

PLC Control Air Shower Tunnel With Conveyor Roller Line / Auto Slide Door

  • 1
  • 2
  • 3

Brand Name : K-LING

Model Number : KEL-AS2100

Certification : CE

Place of Origin : China

MOQ : 1sets

Supply Ability : 10set/ month

Delivery Time : 15 working days

Packaging Details : polywood packing

Price : USD3000-8000

Material : inside is stainless steel 304 ,outside is steel with power coated

Auto Door : PVC roller door

Conveyor line : auto matic roller conveyor line

Control System : DELTA PLC

Blowing way : 3 side

Control Program : Personal Tailor

Power : 380V/50HZ

Capacity : 1000kgs

Name : PLC Control Air Shower Tunnel

Contact Now

PLC Control Air Shower Tunnel With Conveyor Roller Line / Auto Slide Door

Air shower tunnel for Medical Device Manufacturing Industry:

Air shower tunnel provides clean and hygienic environments for the manufacturing of medical devices. The air shower system removes harmful particles and contaminants, leading to improved product quality and safety.

External size : 2110x2380x2400mm

Internal size : 1460x1650x1900mm

Material: External is steel with power coated internal is stainless steel 304

Both side with Auto Roller Door

air speed: more than 24m/s

Control system : PLC control system

Compact product : Auto Conveyor Line

The follow draw illustration :

1: Roll door mechanism

2: Air shower nozzle

3: HEPA air filter

4: per-filter

5: blowing

6: control box for the roll door

7: purification light

PLC Control Air Shower Tunnel With Conveyor Roller Line / Auto Slide Door

Control program: The pallet pass box line can be working in both direction whenever it is. .

It can put out full pallet and then put only one empty pallet

From clean room to dirty room:

A working press the button1, the D1 will be open,

He left the pallet with finished goods on the conveyor and push the button 1 again for the D1 closed. (the D1 can’t close if the sensor 1 not detected any thing).

After D1 closed completely, the D2 open, meanwhile the conveyor1 and conveyor2 move the pallet goods out of the pass box until the sensor 2 detected the pallet the conveyor stop working. The door2 closed.

Note: worker take off the pallets from conveyor 2, then the sensor 2 can’t detect anything, during this time, if someone press the button1 or 2, there is no any respond.

From dirty room to clean room:

A worker left the empty pallet on the conveyor, he press the button2, the D2 will be open and the conveyor will be take the empty pallet to the inside of pass box, when the sensor 3 detects the pallet, the conveyor stop move, the D2 closed and the self-clean system blowing 15s with ionized air .15s later the D1 open automatic.

Note: worker take off the pallets from convyor1, then the sensor1 or3 can’t detect anything, during this time, if someone press the button1 or 2, there is no any respond,

until the door 1 closed , the new cycle will be start again.

Note: 1: The PLC control system not including the touchable screen.

2: the button1 or button 2 can fix at any place that you wanted

1: Document :

A: Document for custom clear: 1 sets

B: Assemble draw : 1 pcs

C: Circuit diagram draw: 1 pcs

D: Test report : 1sets

E: Additional IQ/OQ/PQ document is available upon request.

2: Extra Free Spare Part so that you can replacement in future by yourself :

HEPA air filter +Pre-filter : 1 sets for air shower pass box

Note: HEPA air filter should be replacement in half and one year.

Pre-filter should be replacement in each 6 months, but it can refresh no more than 3 times

3: Delivery time: 25 working days after we get the deposit.

4: Payment term: 30 T/T in advance, 70% before shipment.

5: The guarantee time is one year excluding consumable parts and Accessories.

6: The price validity time is 30days.

PLC Control system for air shower pass box and roller conveyor line :

PLC Control Air Shower Tunnel With Conveyor Roller Line / Auto Slide Door


Product Tags:

air shower system

      

electronics clean room

      
China PLC Control Air Shower Tunnel With Conveyor Roller Line / Auto Slide Door wholesale

PLC Control Air Shower Tunnel With Conveyor Roller Line / Auto Slide Door Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: KeLing Purification Technology Company
*Subject:
*Message:
Characters Remaining: (0/3000)